NIACC Solar Project
MODUS successfully completed the NIACC Solar PV Field and Rooftop Installations project, a significant milestone in the field of renewable energy.
Selected project image
NIACC Solar Project
MODUS successfully completed the NIACC Solar PV Field and Rooftop Installations project, a significant milestone in the field of renewable energy.
Construction Cost
$6 Million
Completion Date
Summer 2020
Category
Higher Education
Higher Education
MODUS successfully completed the NIACC Solar PV Field and Rooftop Installations project, a significant milestone in the field of renewable energy.
Project narrative
MODUS successfully completed the NIACC Solar PV Field and Rooftop Installations project, a significant milestone in the field of renewable energy. The project involved the strategic placement of solar arrays across the NIACC campus and on specific campus rooftops adjacent to existing energy meters. This innovative design allowed NIACC to install 150% more solar energy capacity than if they installed solar at a single interconnection point.
The overall solar production at NIACC will offset approximately 50% of their annual energy usage, translating to roughly $392,200 in annual electric utility savings.
Natural gas generator sets Each building utilizing solar has its own individual meter Parallel electric connection with Alliant Energy Microgrid Central Control of PV and Generators
6,416,560 kWh's at a current cost of $673,991 / year Total Number of Meters Supported by the Solar Generation: 12 Meters 5 - Supported by Solar Ground Arrays Across Campus 4 - Supported by Solar Roof Arrays
5,800 Bi-facial Modules
42 Inverters Controlled by Microgrid Control System
7 Kohler Natural Gas Generators installed for Load Shedding totaling 1.08 MW All generators are connected to the microgrid control system 5 - 180kW for Activity Center, Auditorium, Careers, and McAllister (2) 1 - 100kW for Administration 1 - 80kW for Central Plant
2,547 kW DC (2.55 MW DC) producing: 3,565,496 kWh's (3.565 MWH's) or $392,200 / Year
Approximately 58% Reduces Energy Cost by over $10.7MM in the next 25 Years This project stands as one of the largest solar projects by a community college in the nation and arguably the most unique and complex. It is a testament to MODUS's commitment to innovative and sustainable engineering solutions.
Engineering service
Electrical Engineering
Engineering service
Sustainable Engineering
Engineering service
Facility Planning
Gallery
Related services
Related services show how technical scope connects to client objectives, design intent, operations, and the people who use the building.
Power + Lighting
MODUSElectrical engineering that connects power, lighting, life safety, capacity, and future needs to the building's real use.
Common project types
Performance Strategy
MODUSSustainable engineering that integrates building performance with environmental, social, economic, operational, and community goals.
Common project types
Planning + Studies
MODUSFacility planning that helps owners understand existing systems, future needs, capital priorities, phasing, and practical options before design begins.
Common project types
Next step
NIACC Solar Project is a MODUS portfolio project in Mason City, IA categorized as Higher Education. MODUS successfully completed the NIACC Solar PV Field and Rooftop Installations project, a significant milestone in the field of renewable energy. The project involved the strategic placement of solar arrays across the NIACC campus and on specific campus rooftops adjacent to existing energy meters.