Selected project image
Orchard Hill Elementary
Orchard Hill Elementary is located in an ideal location for an open-loop (pump and reinject) type geothermal system.
Selected project image
Orchard Hill Elementary
Orchard Hill Elementary is located in an ideal location for an open-loop (pump and reinject) type geothermal system.
Size
42,000 SF
Construction Cost
$10,000,000
Completion Date
2019
Education
Orchard Hill Elementary is located in an ideal location for an open-loop (pump and reinject) type geothermal system.
Project narrative
Orchard Hill Elementary is located in an ideal location for an open-loop (pump and reinject) type geothermal system. This project included the installation of a supply and injection well that provides heat transfer media to the entire new 30,000 SF addition. Ground source heat pumps were used heat and cool the new addition and energy recovery ventilators (ERV) were installed to supply fresh air and remove exhaust air from the building.
The well system includes provisions for additional expansion as the district continues to grow. The electrical service was upgraded as part of the project and was relocated to a different part of the building to make way for the renovations taking place in that part of the building. The lighting design features the most current technologies with respect to LED fixtures as well as low voltage controls. Audiovisual systems were used to update the classrooms to be highly interactive.
The overall design concepts from a learning standpoint were initially developed at the new Aldrich Elementary school but were then also applied to North Cedar and Orchard Hill.
Engineering service
Mechanical Engineering
Engineering service
Electrical Engineering
Engineering service
Sustainable Engineering
Engineering service
Technology Engineering
Engineering service
Plumbing Engineering
Engineering service
Lighting Design
Gallery
Related services
Related services show how technical scope connects to client objectives, design intent, operations, and the people who use the building.
Building Systems
MODUSMechanical engineering that starts with client objectives and translates comfort, efficiency, safety, and maintenance needs into coordinated HVAC solutions.
Common project types
Power + Lighting
MODUSElectrical engineering that connects power, lighting, life safety, capacity, and future needs to the building's real use.
Common project types
Performance Strategy
MODUSSustainable engineering that integrates building performance with environmental, social, economic, operational, and community goals.
Common project types
Connected Systems
MODUSTechnology engineering that plans the communications, security, audiovisual, and low-voltage infrastructure modern buildings need to support people and operations.
Common project types
Water + Piping
MODUSPlumbing engineering that connects water, waste, storm, specialty piping, and maintainability to the way the building will be used and operated.
Common project types
Lighting + Controls
MODUSLighting design that connects visibility, safety, atmosphere, controls, energy goals, and user experience with the larger building design.
Common project types
Next step
Orchard Hill Elementary is a MODUS portfolio project in Cedar Falls, IA categorized as Education. Orchard Hill Elementary is located in an ideal location for an open-loop (pump and reinject) type geothermal system. This project included the installation of a supply and injection well that provides heat transfer media to the entire new 30,000 SF addition.